Leasing land & Factory
BAC NINH INDUSTRIAL ZONES (P1)
A. VSIP Bacninh Industrial Park
- Position:Far from Hanoi Capital about 16km, Far from Noi Bai international airport about 55km, Far from Cai Lan sea port (Ha Long city)about 140km, Far from Lang Son border gate about 135km, Far from Hai Phong sea port about 110km
- Total planned area:700 ha, of which area for industrial park is 500ha, for City 200ha.
- Investment owner:VSIP Bacninh company Ltd
+ Head office: 2 Floor, Hanoi Lakeview Building, 28 Thanh Nien Road, Tay Ho District, Hanoi
+ Tel.04-3716 2330
+ Fax: 04.3716 2315
+ Site location: No. 1, Huu Nghi St., Phu Chan Commune, Tu Son Town, Bac Ninh Province
+ Tel: 0241-3765668
+ Fax: 0241-3765666
B. Thuan Thanh 3 Industrial Park
- Position: Locates alongside the Provincial Highway 282 (Ho – Phu Thuy Ruite), to the south of Ho Town. Far from Hanoi Capital about 60km, Far from Noi Bai international airport about 65km, Far from Cai Lan sea port (Ha Long city) about 145km, Far from Lang Son border gate about 140km, Far from Hai Phong sea port about 105km.
The IP technical infrastructures shall be invested and built synchronously for stable development of industrial park.
- Total area:300 ha
- Investment owner:
– Investment owner 1: Khai Son company Ltd
+ Head Office: Thuan Thanh 3 Industrial zone, Thanh Khuong Commune, Thuan Thanh District, Bacninh province
Tel: 0241.387.3062
+ Office Representative: Room 5, 15th floor, Plaschem Building, No 562, Nguyen Van Cu St, Long Bien Dist., Ha Noi, Viet Nam
+ Tel: 04-9743582/4-2200495
+ Fax: 04-2200494
+ Email: [email protected]
+ Web: http://khaison.vn
– Investment owner 2: Trung Quy Investment Stock company Bac Ninh
+ Add: 263 Nguyen Trai road, Vo Cuong wards, Bacinh city, Bacinh provice
+ Tel/Fax: 0241.3896099
C. Tien Son Industrial Park
- Position:Far from Hanoi Capital 22km, Far from Noi Bai international airport 30km, Far from Cai Lan sea port (Ha Long city) 120km, Far from Lang Son border gate 120km, Far from Hai Phong sea port 120km.
- Planned area:410 ha. (380 ha for industrial park and 30 for city)
- Total infrastructure investment capital:837.5 billion VND. Perfect and synchronous infrastructures: power station 110/60MVA, fresh water supplying station 6,500m3/day and night, the operating centre, main way of 37.5m width, branch roads, system of drainage and waste water treatment, telecommunication service, financial services, banking services, customs, protection service and container grounds.
- Investment owner:Glass and Ceramics for Construction Corporation (Viglacera).
+ Address: Tien Son Industrial Park, Bacninh Province.
+ Tel: 0241.3838583
+ Fax: 0241.3838583
+ E-mail: [email protected]
+ Website: www.viglacera.org.vn
+ Head Office: The Floor 12th Viglacera Tower, No 1, Lang Hoa Lac Road, Ha Noi, Vietnam.
D. Que Vo Industrial Park
- Position:Far from Hanoi Capital about 35km, Far from Noi Bai international airport about 50km, Far from Cai Lan sea port (Ha Long city) about 110km, Far from Lang Son border gate about 125km, Far from Hai Phong sea port about 120km
- Planned area:611ha
- Total infrastructure investment capital:1,121 billion VND
- Perfect and synchronous infrastructures:power station 110/22KV-80MVA, fresh water supplying station 6,500m3/day and night, system of drainage and waste water treatment, ICD port (inland port), National Highway 18, branches roads, posts and telecommunication service centre, financial services, banking services, customs, protection service, etc
* Besides, Phuc Ninh City Park planning (area: 120ha) is also implemented to serve the industrial park.
- Investment owner:Kinh Bac City Development Share Holding Corporation. + Address: Que Vo Industrial Zone, Bacninh Province.
+ Tel: 0241-3634024/34
+ Fax: 0241-3634035
+ E-mail: [email protected] Website: www.kinhbaccity.com
E. Yen Phong Urban; Industrial Park
- Position:Far from Hanoi Capital about 40km, Far from Noi Bai international airport about 30km, Far from Cai Lan sea port (Ha Long city)about 130km, Far from Lang Son border gate about 130km, Far from Hai Phong sea port about 130km
- Total infrastructure investment capital:1,200 billion VND
- Planned area:655 ha (First stage : 355ha, Second stage: 300ha)
- Investment owner:Glass and Ceramics for Construction Corporation (Viglacera).
+ Add: Yen Phong Industrial Park , Bacninh Province.
+ Tel: 0241-3689199.
+ Fax: 0241-3689199.
+ E-mail: [email protected]
+ Website: www.viglacera.org.vn
+ Head Office: The Floor 12th Viglacera Tower, No 1, Lang Hoa Lac Road, Ha Noi, Vietnam
F. Dai Dong – Hoan Son Industrial Park
- Position:Far from Hanoi Capital about 20km, Far from Noi Bai international airport about 50km, Far from Cai Lan sea port (Ha Long city) about 135km, Far from Lang Son border gate about 130km, Far from Hai Phong sea port about 120km
The IP technical infrastructures shall be built synchronously under the international standards.
- Planned area:530 ha.
3 Investment owner: Saigon Telecommunication and Technologies Corporation
+ Address: No.11, Tu Xuong, District 3, Hochiminh City.
+ Tel: 08-39322301
+ Fax: 08-39322302
G. Que Vo II Industrial Park
- Position: Far from Hanoi Capital about 55km, Far from Noi Bai international airport about 70km, Far from Cai Lan sea port (Ha Long city) about 90km, Far from Lang Son border gate about 145km, Far from Hai Phong sea port about 140km
The IP socio-technical infrastructures shall be built synchronously for lurement of investment projects.
- Total area:270 ha
- Investment owner:City and IP Development & Investment Corporation (IDICO)
+ Add: 19c Hoang Dieu Road, Dien Bien – Ba Dinh District – Hanoi, Vietnam.
+ Tel: 04-37347161
+ Fax: 04-37347162
+ website: idicoquevo.com.vn
H. Que Vo 3 Industrial Park
Position:Far from Hanoi Capital about 52km, Far from Noi Bai international airport about 67km, Far from Cai Lan sea port (Ha Long city) about 97km, Far from Lang Son border gate about 142km, Far from Hai Phong sea port about 137km
The IP technical infrastructures shall be invested and built synchronously for stable development of industrial park.
- Total area:350 ha, of which area for Industrial park is 300 ha, for city 50 ha
- Investment owner: DABACO JSC
+ Add: Ly Thai To Road, Bacinh City, Bacninh Province.
+ Tel: 0241-3826077/3895111
+ Fax: 0241-3826095/3821377
I. Hanaka Industrial Park
Position:Far from Hanoi Capital about 25km, Far from Noi Bai international airport about 38km, Far from Cai Lan sea port (Ha Long city) about 130km, Far from Lang Son border gate about 140km, Far from Hai Phong sea port about 125km.
The IP technical infrastructures shall be invested and built synchronously for stable development of industrial park.
- Total area:74 ha
- Investment owner:Hanaka group (Vietnam)
+ Add: 271 province road, Dong Nguyen wards, Tu Son town, Bacninh Province.
+ Tel: 0241-3741998 / 3741888
+ Fax: 0241-3741777
+ Email: [email protected]
+ Web: http://hanaka.com.vn
J. Thuan Thanh 2 Industrial Park
1 Position: Far from Hanoi Capital about 55km, Far from Noi Bai international airport about 60km, Far from Cai Lan sea port (Ha Long city) about 140km, Far from Lang Son border gate about 140km, Far from Hai Phong sea port about 100km.
The IP technical infrastructures shall be invested and built synchronously for stable development of industrial park.
- Planned area at the first stage:250 ha
- Investment Owner :Shun – Far Land Deverlopment Co.ltd (Taiwan)
Add: Thuan Thanh 2 Industrial Park, Thuan Thanh district, Bac Ninh Province
Tel : 084 2413 778 688
Fax: 084 2413 778 666
Leave a reply